Gelişmiş Arama

Basit öğe kaydını göster

dc.contributor.authorSaracoğlu, İlkay
dc.contributor.authorSüer, Gürsel A.
dc.contributor.authorGannon, Patrick
dc.date.accessioned2023-10-30T08:59:31Z
dc.date.available2023-10-30T08:59:31Z
dc.date.issued2021en_US
dc.identifier.citationSaraçoğlu, İ. Süer, G. A. and Gannon P. (2021). Minimizing makespan and flowtime in a parallel multi-stage cellular manufacturing company. Robot. Comput.-Integr. Manuf. 72, C (Dec 2021). https://doi.org/10.1016/j.rcim.2021.102182en_US
dc.identifier.urihttps://hdl.handle.net/20.500.12900/206
dc.description.abstractThis study proposes a 3-phase solution approach for a multi-product parallel multi-stage cellular manufacturing company. The study focuses on a case study involving a shoe manufacturing plant in which products are produced according to their due dates. The investigated manufacturing process has three stages, namely lasting cells, rotary injection molding cells, finishing-packaging cells. System performance is measured based on total flowtime and makespan. We propose a 3-phase solution approach to tackle the problem; 1) the first phase of the proposed approach allocates manpower to operations in the lasting cells and finishing-packaging cells, independently. The objective is to maximize the production rates in these cells. 2) The second phase includes cell loading to determine product families based on a similarity coefficient using mathematical modeling and genetic algorithms (GA). The proposed GA algorithm for cell loading performs mutation prior to crossover, breaking from traditional genetic algorithm flow. The performance measures flow time and makespan are considered in this phase. 3) Flow shop scheduling is then performed to determine the product sequence in each (lasting, rotary injection molding, finishing-packaging) cell group. This 3-phase solution approached is repeated with alternative manpower level allocation to lasting and finishing-packaging cells where the total manpower level remains the same.en_US
dc.language.isoengen_US
dc.publisherPERGAMON-ELSEVIER SCIENCE LTDen_US
dc.relation.isversionof10.1016/j.rcim.2021.102182en_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectAkış atölyesi planlamasıen_US
dc.subjectFlow shop schedulingen_US
dc.subjectGenetik Algoritmaen_US
dc.subjectGenetic algorithmen_US
dc.subjectKarışık tamsayılı doğrusal programlamaen_US
dc.subjectMixed integer linear programmingen_US
dc.subjectHücre yüklemeen_US
dc.subjectCell loadingen_US
dc.subjectHücresel imalaten_US
dc.subjectCellular manufacturingen_US
dc.titleMinimizing makespan and flowtime in a parallel multi-stage cellular manufacturing companyen_US
dc.typearticleen_US
dc.departmentİstanbul Atlas Üniversitesi, Mühendislik ve Doğa Bilimleri Fakültesi, Endüstri Mühendisliği Bölümüen_US
dc.authorid0000-0003-3338-4912en_US
dc.contributor.institutionauthorSaracoğlu, İlkay
dc.identifier.volume72en_US
dc.identifier.startpage1en_US
dc.identifier.endpage11en_US
dc.relation.journalRobotics and Computer-Integrated Manufacturingen_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US


Bu öğenin dosyaları:

Thumbnail

Bu öğe aşağıdaki koleksiyon(lar)da görünmektedir.

Basit öğe kaydını göster